• Exterior site grading continues including prepping to pour sidewalks as well as the entrance driveway.
  • Transformer is being set today.
  • Exterior siding continues and should be completed in about a week.
  • Interior drywall is about 90% complete and should be finished in about a week.
  • Painting continues.
  • The floor is continuing to be installed on the first floor and installation will begin in the basement.
  • Molding and trim work continues, as well as setting casework.
  • Interior mechanical and electrical rough ins are nearly complete.
  • The building’s permanent power should be turned on within two weeks.
  • Workers will be on site tomorrow 10/21.

Iā€™m always recommending The Hickman. As long-time residents in the area, this is our community. Living here has given my Dad a sense of belonging... a feeling of home.ā€

The staff here really do care. I enjoy the social aspects, and the food is excellent.ā€

Within the first week, my Dad settled in. Not long after that, he said one day 'I'm glad it was my idea to come here.ā€

Call today (484) 760-6300
Schedule A Tour

Send this to a friend