• Structural steel stud walls for the first floor were set this week.
  • The 2nd floor joists are being installed and prepped for pouring the second floor concrete in the next week.
  • Backfilling around the building continues.  
  • Interior ground floor wall framing will begin next week.
  • No Saturday work is planned at this time.