• For the duration of the project it should be assumed that there will be a few workers on site every Saturday.  Depending on the weather and other factors, there could be up to 20 or 30 workers on site on a Saturday.
  • Second floor joist and deck continue to be set so the balance of the floor can be poured this week.
  • Ground floor wall layout has started and interior framing will begin.
  • Next week, the 2nd floor exterior structural stud walls will be set.
  • Second floor decking will be stripped next week.
  • Preparing for the installation of electrical work that will begin over the next few weeks.           